End of repair works m/v Glard-2

24.09.2021

Tanker "Glard-2" entered for intermediate dry dock repair at 30.07.2021 and the repair was completed on date 17.08.2021.

During repair the following main work took place: cleaning and painting of the ship's hull; BWTS - pipe tracing and installation - 1st stage of installation of BWTS.

All repair works were performed under the rules of RINA.

Varsa Shipping Ltd.

Copyright © 2016. All Rights Reserved